Method for predicting life of steam turbine.(License from Korea Electric Power Corporation)
1. Measuring Point.
2. Indentation Test
Measuring at least one among Elasticity, hardness, Yield strength and tensile strength
3. Calculation of Cyclic Life Expenditure
4. Assessment of Residual Life.
5. Marketability
Making the best use of new technology in Power Plant.
Considering cogeneration plant more 10 years around world,
many demand is expected to be generated.
'Licensing Market > Licensing Market' 카테고리의 다른 글
Modification of coal using palm residue.(Korea Institute of Energy Research) (0) | 2014.05.22 |
---|---|
The piezoelectricity generator from Korea Electronics Technology Institute (0) | 2014.05.16 |
Air Greenhouse from South Korea. (0) | 2014.05.12 |
(Internet of the Things).SYSTEM FOR DETECTING SLEEP DISORDERS WITH SENSOR UNIT ATTACHED TO TROUSERS. (0) | 2014.04.29 |
trial result report... (0) | 2014.04.22 |